Planning a Padel Development? 10 Questions You Should Ask Before Choosing a Site

Padel development is moving quickly across the UK. Sports clubs, golf clubs, leisure operators, landowners and investors are all looking at opportunities to develop new court hubs.

But there is a big difference between finding a space that can physically accommodate a few padel courts and finding a site that will get through the planning process.

From our experience looking at padel developments, some of the most expensive problems can be identified surprisingly early. Noise, neighbours, planning, lighting, access and operating hours can all influence whether a fantastic looking site remains fantastic once you dig into the detail. Our recent look at how the planning process for padel is changing in the UK covers why that detail matters more than ever.

So, before you order the courts, sign a long lease or get too attached to that empty corner of a sports club, here are ten questions worth asking.

1. Do I need planning permission for padel courts?

In most cases, you should work on the assumption that planning will need to be considered.

The LTA Padel Court Data Sheet states that constructing a padel court, whether on a new site or over an existing tennis court, constitutes development requiring formal planning consent. It also identifies the glass walls, mesh fencing and proposed floodlighting as matters requiring planning consent. (LTA Padel Court Guidance)

An existing sporting use therefore shouldn’t automatically be interpreted as a planning green light. Clubs looking at converting existing courts should also see our guidance on the padel planning process for tennis clubs.

The advice is simple: understand the planning position before committing significant money to a site.

2. How much space do I actually need?

A padel court’s playing area is 20 m x 10 m, but designing a development around a series of 20 m x 10 m rectangles is a mistake.

You also need to consider circulation, access, drainage, lighting, maintenance and, depending upon the level of competition proposed, areas for out-of-court play. The LTA also recommends minimum clear heights for covered or indoor facilities. (LTA Padel Construction), (LTA Padel Court Guidance)

And don’t forget something that doesn’t appear on the tape measure:

the relationship between the courts and their neighbours.

Where you put the courts within your site can sometimes be just as important as whether they fit.

3. How close can padel courts be to houses?

This is probably the question we’re asked most often from an acoustics perspective.

Unfortunately, there isn’t a magic number.

It would be lovely if we could say:

“Keep padel courts 50 metres from houses and everything will be fine.”

Real-world acoustics doesn’t work like that.

Distance matters, but so do the number of courts, orientation, barriers, topography, buildings, operating hours and the existing acoustic environment.

Importantly, the LTA specifically advises developers to give careful consideration to court location in relation to the potential impact of noise on adjacent residential properties. (LTA Padel Court Guidance) Our comparison of BS4142 and the Dutch Padel Noise Guidance looks at how different standards approach this question.

The better question is therefore:

“Can the noise from this particular development be appropriately controlled at these particular houses?”

That’s a question an acoustician can actually answer.

4. Why is padel noise different from tennis?

Padel has some interesting acoustic characteristics.

It isn’t simply the sound of a ball being hit with a racket. There can also be ball impacts against the court enclosure and contributions from people using the courts.

Current acoustic guidance aimed at padel developers identifies racket impacts, impacts on glass and mesh, player voices, repetition and the distinctive character of the sound as relevant considerations. (May Walters Acoustics) Our research directly comparing padel and tennis noise sets out the detail behind that distinction.

That distinction matters.

In environmental acoustics, it is rarely enough simply to ask “How loud is it?” We also need to understand what the sound is like, how often it occurs, when it occurs and the environment into which we’re introducing it.

5. Should I get an acoustic consultant involved before planning?

If there are noise-sensitive properties nearby, we’d strongly recommend thinking about acoustics early.

This doesn’t necessarily mean commissioning a huge report before you’ve even decided whether you like the site — our guide to what a Noise Impact Assessment is and when you need one explains how that process typically starts.

What it means is making acoustics part of site feasibility rather than treating it as a problem to solve once the design has been completed.

A few early decisions around court location and layout can potentially be much easier to deal with on a drawing than after the project has been designed.

Acoustic assessment work on padel developments considers matters including court numbers, distance, orientation, nearby properties and screening.

The best acoustic mitigation is often good design.

6. Will I need an acoustic barrier?

Maybe, but don’t start there.

We regularly see people approach environmental noise backwards:

“We’ve got a noise problem. How high does the fence need to be?”

Before considering a barrier, it’s important to understand the source, receiver, distance, site geometry and required level of mitigation.

Buildings themselves may provide screening. Court orientation may help. Location may help. Operating arrangements may help.

A barrier can be extremely useful, but it should be the result of an acoustic assessment, not the starting assumption. Our article on padel noise mitigation looks at the full range of design measures, barriers included.

7. What other planning issues should I consider?

Noise is important, but it’s certainly not the only consideration.

Current UK padel planning guidance identifies matters including:

  • floodlighting
  • drainage
  • access
  • parking
  • landscaping
  • ecology
  • trees
  • enclosure and visual impact
  • neighbouring amenity (Padel and Tennis)

That is why we’d encourage developers to look at site feasibility in a holistic way — our overview of padel planning guidance and standards brings these threads together.

A £100,000 problem identified before you acquire a site is useful information. The same problem discovered afterwards is simply a £100,000 problem.

8. Do operating hours matter?

Absolutely.

A sound that might attract little attention during the daytime can become much more noticeable when the surrounding environment becomes quieter.

Consequently, an acoustic assessment should consider how the development will actually operate.

Current specialist guidance highlights proposed operating hours, simultaneous court use, coaching, spectators and other associated activities as relevant considerations when establishing the acoustic assumptions for a development.

This is one reason we like talking to operators, rather than just looking at architectural drawings.

9. When should noise be considered in the development programme?

As early as possible.

Traditionally, acousticians sometimes arrive rather late to development projects. The scheme has been designed, the planning drawings are finished and someone suddenly asks:

“Do we need a noise report?”

For padel, we’d argue for a different approach.

Think about noise when you’re assessing the site.

Think about it when you’re deciding where the courts should go.

Think about it when determining court numbers and operating hours.

And definitely think about it before locating the courts next to the site’s most noise-sensitive neighbour.

Early acoustic input shouldn’t be viewed simply as another planning cost. Used properly, acoustics is a design tool and a method of managing development risk — our practical guide to understanding a Noise Impact Assessment is a useful next read if you’re planning ahead.

10. So what should I do before committing to a padel site?

Take a step back and undertake a sensible feasibility review.

Ask:

  • Does planning policy support the development?
  • Where are the nearest houses?
  • Could noise constrain the site?
  • Where should the courts be positioned?
  • How many courts are realistic?
  • What operating hours do we need?
  • Will lighting be acceptable?
  • Is access appropriate?
  • Are there drainage, ecology or landscape constraints?

And finally:

If any of those things don’t work, do we have a realistic solution?

That’s the point at which a site starts moving from “there’s enough room for some padel courts” to “we have a deliverable padel development.”

If you’re weighing up a site right now, our Padel Acoustic Guidance service can help you answer these questions before you commit.

About the Author

May Walters Acoustic Consultants (MWA) specialise in noise research, noise assessments and peer reviews for padel developments.

In 2024 we published one of the most detailed research papers into the noise created by padel courts, which was conducted independently, and under the technical supervision of the IOA. This research has subsequently been presented to the members of the Chartered Institute of Environmental Health (CIEH) at conference, formed content into their training resource and presented at the National IOA Conference for peer review.

A noise model has been created from this research to accurately describe noise and predict its propagation from the courts to any local residences so that the impact of construction of padel facilities can be fully understood.